Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.15.0#139

Merged
GangGreenTemperTatum merged 1 commit intomainfrom
renovate/astral-sh-ruff-pre-commit-0.x
Feb 4, 2026
Merged

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.15.0#139
GangGreenTemperTatum merged 1 commit intomainfrom
renovate/astral-sh-ruff-pre-commit-0.x

Conversation

@dreadnode-renovate-bot
Copy link
Contributor

@dreadnode-renovate-bot dreadnode-renovate-bot bot commented Feb 4, 2026

This PR contains the following updates:

| Package | Type | Update | Change |
|

Generated Summary:

  • Upgraded ruff pre-commit hook version from v0.14.14 to v0.15.0.
  • This update applies to the pre-commit configuration ensuring usage of the latest ruff functionalities.
  • No other modifications were made.

This summary was generated with ❤️ by rigging

| astral-sh/ruff-pre-commit | repository | minor | v0.14.14v0.15.0 |

Note: The pre-commit manager in Renovate is not supported by the pre-commit maintainers or community. Please do not report any problems there, instead create a Discussion in the Renovate repository if you have any questions.


Release Notes

astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)

v0.15.0

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.15.0


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

| datasource  | package                   | from     | to      |
| ----------- | ------------------------- | -------- | ------- |
| github-tags | astral-sh/ruff-pre-commit | v0.14.14 | v0.15.0 |
@dreadnode-renovate-bot dreadnode-renovate-bot bot requested a review from a team as a code owner February 4, 2026 00:18
@dreadnode-renovate-bot dreadnode-renovate-bot bot added area/pre-commit Changes made to pre-commit hooks type/digest Dependency digest updates labels Feb 4, 2026
@GangGreenTemperTatum GangGreenTemperTatum merged commit 256f247 into main Feb 4, 2026
5 checks passed
@GangGreenTemperTatum GangGreenTemperTatum deleted the renovate/astral-sh-ruff-pre-commit-0.x branch February 4, 2026 00:19
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

area/pre-commit Changes made to pre-commit hooks type/digest Dependency digest updates

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant