Open
Conversation
14 tasks
bobbyxng
reviewed
Mar 17, 2026
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.5089,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php,Original values 0.5089 per Mt clinker,2015.0,, |
There was a problem hiding this comment.
do you mean "Original values 0.5089 [Mt] per Mt clinker"? or is Mt a typo?
bobbyxng
reviewed
Mar 17, 2026
bobbyxng
left a comment
There was a problem hiding this comment.
LGTM, only a minor comment question on the original values' unit.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Changes proposed in this Pull Request
During clinker production, the calcination process leads to unavoidable process emissions independent of what's used to supply the heat.
For endogenous heat modelling and cement modelling it is helpful to have this emissions factor in technology data.
The data is from the IPCC Database and shows a value of 0.5089 tonne CO2/tonne clinker produced
Compared to e.g. POSTED it is slightly higher:
total emissions - coal demand x coal emissivity
0.6361765 − 0.6634401×0.3361 = 0.413194282 tCO2/tclinker
Happy to hear thoughts on that
Checklist
doc.environment.yaml(if applicable). not applicabledoc/release_notes.rstof the upcoming release is included.