Skip to content

Node 10.7.0 SRE Prep#6478

Draft
johnalotoski wants to merge 13 commits intogeo2a/10.7-integrationfrom
jl/10.7.0-sre
Draft

Node 10.7.0 SRE Prep#6478
johnalotoski wants to merge 13 commits intogeo2a/10.7-integrationfrom
jl/10.7.0-sre

Conversation

@johnalotoski
Copy link
Contributor

Description

  • WIP

Checklist

  • Commit sequence broadly makes sense and commits have useful messages
  • New tests are added if needed and existing tests are updated. These may include:
  • CI passes. See note on CI. The following CI checks are required:
  • Self-reviewed the diff

@johnalotoski johnalotoski changed the title Jl/10.7.0 sre Node 10.7.0 SRE Prep Mar 6, 2026
@geo2a geo2a force-pushed the geo2a/10.7-integration branch 2 times, most recently from 4898b52 to e525e3c Compare March 6, 2026 15:30
Copy link
Contributor

@mgmeier mgmeier left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM

@geo2a geo2a force-pushed the geo2a/10.7-integration branch 2 times, most recently from 9524878 to 7c1388b Compare March 10, 2026 08:48
@johnalotoski johnalotoski force-pushed the jl/10.7.0-sre branch 2 times, most recently from 32de690 to cc83f67 Compare March 11, 2026 01:55
@geo2a geo2a force-pushed the geo2a/10.7-integration branch 4 times, most recently from c21be78 to 6563fb4 Compare March 11, 2026 11:25
@geo2a geo2a force-pushed the geo2a/10.7-integration branch 6 times, most recently from f5e82de to 56504d8 Compare March 12, 2026 11:48
@johnalotoski johnalotoski force-pushed the jl/10.7.0-sre branch 2 times, most recently from 8b2c91b to fbd5c58 Compare March 12, 2026 15:53
@geo2a geo2a force-pushed the geo2a/10.7-integration branch 3 times, most recently from 28b1c2a to 6118792 Compare March 13, 2026 12:00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants