Conversation
The convention is to assign to q/pT = 1/mostProbablePt(=0.6) in case of B=0
|
REQUEST FOR PRODUCTION RELEASES: This will add The following labels are available |
Why? https://github.com/AliceO2Group/AliceO2/pull/14370/changes#diff-eae8fda90330056fb3951aed0952fec5a6370dbec65f6164ebbb94636e3a36ccR1249 looks correct. |
Yeah, sorry, meant in the subsequent change it broke (the linked one was the last correct one) |
The convention is to assign to q/pT = 1/mostProbablePt(=0.6) in case of B=0
Due to the sign inversion the ITS/TPC matching for B=0 was failing.