forked from NatLabRockies/GEOPHIRES-X
-
Notifications
You must be signed in to change notification settings - Fork 1
Expand file tree
/
Copy pathexample5b.txt
More file actions
66 lines (60 loc) · 4.84 KB
/
example5b.txt
File metadata and controls
66 lines (60 loc) · 4.84 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
# Example 5b: Geothermal Direct-Use Example Problem using User-Provided Temperature Data
# The reservoir output temperature is provided via the Reservoir Output Profile parameter
# *** Subsurface technical parameters ***
# ****************************************
Reservoir Model,5, --- User provided reservoir output temperature data
Reservoir Output Profile, 150,150,150,150,149.9999,149.9992,149.9958,149.9854,149.9628,149.9226,149.8604,149.773,149.6587,149.5168,149.3479,149.153,148.9337,148.6919,148.4295,148.1487,147.8515,147.5397,147.2153,146.88,146.5353,146.1828,145.8237,145.4592,145.0905,144.7184,144.3439,143.9677,143.5905,143.213,142.8356,142.4589,142.0832,141.709,141.3365,140.9661,140.598,140.2324,139.8696,139.5096,139.1526,138.7987,138.448,138.1007,137.7566,137.4161,137.0789,136.7453,136.4152,136.0885,135.7655,135.4459,135.1299,134.8173,134.5083,134.2027,133.9006,133.6019,133.3066,133.0146,132.726,132.4407,132.1586,131.8797,131.6041,131.3315,131.0621,130.7957,130.5324,130.272,130.0146,129.7601,129.5084,129.2595,129.0135,128.7701,128.5295,128.2915,128.0561,127.8233,127.593,127.3653,127.1399,126.9171,126.6966,126.4784,126.2626,126.049,125.8377,125.6286,125.4217,125.217,125.0143,124.8137,124.6152,124.4186,124.2241,124.0315,123.8409,123.6521,123.4652,123.2801,123.0969,122.9154,122.7357,122.5578,122.3815,122.2069,122.034,121.8627,121.693,121.525,121.3584,121.1934,121.03,120.868,120.7075
Reservoir Output Profile Time Step, 0.25
Reservoir Depth,3, --- [km]
Number of Segments,1, --- [-]
Gradient 1,45, --- [deg.C/km]
Number of Production Wells,2, --- [-]
Number of Injection Wells,2, --- [-]
Production Well Diameter,9.625, --- [inch]
Injection Well Diameter,9.625, --- [inch]
Ramey Production Wellbore Model,1, --- Should be 0 (disable) or 1 (enable)
Injection Wellbore Temperature Gain,0, --- [deg.C]
Production Flow Rate per Well,50, --- [kg/s]
Maximum Temperature,375, --- [deg.C]
Reservoir Volume Option,4, --- Should be 1 2 3 or 4. See manual for details.
Reservoir Volume,1e9, --- [m3] (required for reservoir volume option 3 and 4
Water Loss Fraction,0.02, --- [-] (total geofluid lost)/(total geofluid produced)
Reservoir Impedance,0.05, --- [GPa*s/m3]
Injection Temperature,80, --- [deg.C]
Reservoir Heat Capacity,1050, --- [J/kg/K]
Reservoir Density,2700, --- [kg/m3]
Reservoir Thermal Conductivity,3, --- [W/m/K]
# *** Surface technical parameters ***
# ************************************
End-Use Option,2, --- [-] Direct-Use
Circulation Pump Efficiency,0.8, --- [-]
Utilization Factor,0.9, --- [-]
Surface Temperature,15, --- [deg.C]
Ambient Temperature,15, --- [deg.C]
End-Use Efficiency Factor,0.9, --- [-]
# *** Economic/Financial Parameters ***
# *************************************
Plant Lifetime,30, --- [years]
Economic Model,3, --- Should be 1 (FCR model) 2 (Standard LCOE/LCOH model) or 3 (Bicycle model).
Fraction of Investment in Bonds,0.65, --- [-] Required if Bicycle model is selected. See manual for details.
Inflated Bond Interest Rate,0.07, --- [-] Required if Bicycle model is selected. See manual for details.
Inflated Equity Interest Rate,0.12, --- [-] Required if Bicycle model is selected. See manual for details.
Inflation Rate,0.025, --- [-] Required if Bicycle model is selected. See manual for details.
Combined Income Tax Rate,0.392, --- [-] Required if Bicycle model is selected. See manual for details.
Gross Revenue Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Investment Tax Credit Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Property Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Well Drilling and Completion Capital Cost Adjustment Factor,1, --- [-] Use built-in well cost correlation as is
Well Drilling Cost Correlation,1, --- [-] Use built-in well drilling cost correlation #1
Reservoir Stimulation Capital Cost Adjustment Factor,1, --- [-] Use built-in reservoir stimulation cost correlation as is
Surface Plant Capital Cost Adjustment Factor,1, --- [-] Use built-in surface plant cost correlation as is
Field Gathering System Capital Cost Adjustment Factor,1, --- [-] Use built-in pipeline distribution cost correlation as is
Exploration Capital Cost Adjustment Factor,1, --- [-] Use built-in exploration cost correlation as is
Wellfield O&M Cost Adjustment Factor,1, --- [-] Use built-in wellfield O&M cost correlation as is
Water Cost Adjustment Factor,1, --- [-] Use built-in water cost correlation as is
Surface Plant O&M Cost Adjustment Factor,1, --- [-] Use built-in surface plant O&M cost correlation as is
Inflation Rate During Construction,0, --- [-]
Electricity Rate,0.07, --- [$/kWh] for pumping power
# *** Simulation Parameters ***
Print Output to Console,1, --- [-] Should be 0 (don't print results to console) or 1 (print results to console)
Time steps per year,4, --- [1/year]