chore(deps): bump the gradle group across 1 directory with 9 updates #427
Annotations
5 errors
|
Java 8 Test
Process completed with exit code 1.
|
|
Java 21 Test
The strategy configuration was canceled because "test._8" failed
|
|
Java 21 Test
The operation was canceled.
|
|
Java 24 Test
The strategy configuration was canceled because "test._8" failed
|
|
Java 24 Test
The operation was canceled.
|