Skip to content

Serialize true false #6475

Serialize true false

Serialize true false #6475

Re-run triggered September 26, 2025 14:08
Status Failure
Total duration 18m 6s
Artifacts

python-ci.yml

on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
lint-and-test (3.10)
Process completed with exit code 2.
lint-and-test (3.11)
Process completed with exit code 2.
lint-and-test (3.11)
The strategy configuration was canceled because "lint-and-test._3_10" failed
lint-and-test (3.9)
The operation was canceled.
lint-and-test (3.9)
The strategy configuration was canceled because "lint-and-test._3_10" failed
lint-and-test (3.12)
The operation was canceled.
lint-and-test (3.12)
The strategy configuration was canceled because "lint-and-test._3_10" failed