Use Iceberg-Rust for parsing the ManifestList and Manifests #6460
Triggered via pull request
September 26, 2025 10:10
Status
Failure
Total duration
14m 18s
Artifacts
–
python-ci.yml
on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Annotations
14 errors
|
lint-and-test (3.11)
Process completed with exit code 2.
|
|
lint-and-test (3.10)
Process completed with exit code 2.
|
|
lint-and-test (3.10)
The strategy configuration was canceled because "lint-and-test._3_11" failed
|
|
lint-and-test (3.12)
The operation was canceled.
|
|
lint-and-test (3.12)
The strategy configuration was canceled because "lint-and-test._3_11" failed
|
|
lint-and-test (3.9)
The operation was canceled.
|
|
lint-and-test (3.9)
The strategy configuration was canceled because "lint-and-test._3_11" failed
|
|
integration-test (3.11)
Process completed with exit code 2.
|
|
integration-test (3.12)
The operation was canceled.
|
|
integration-test (3.12)
The strategy configuration was canceled because "integration-test._3_11" failed
|
|
integration-test (3.9)
The operation was canceled.
|
|
integration-test (3.9)
The strategy configuration was canceled because "integration-test._3_11" failed
|
|
integration-test (3.10)
The operation was canceled.
|
|
integration-test (3.10)
The strategy configuration was canceled because "integration-test._3_11" failed
|