Skip to content
This repository was archived by the owner on Jul 16, 2020. It is now read-only.
This repository was archived by the owner on Jul 16, 2020. It is now read-only.

HRT Data Visualization #32

@bschoenfeld

Description

@bschoenfeld

Sometimes the data has invalid adherences. From what I can tell, this happens when a bus has finished its route. I'd like to have a better tool for analyzing things like this. I picture a chart like this.

bus

Small dots are location checkins.
Large dots are time checks.

Adherence line: Updates between small and large dots. Line thickness is adherence value. Green for early, yellow for late, black for on time, red for invalid.

Route / Schedule line: Updates between large dots. Green if we know the route and were able to lookup the scheduled stop. Blue if we know the route, failed to lookup the scheduled stop, but we have older data that is being relied on. Yellow if we only know the route. Black if we don't know the route.

--- Want to back this issue? **[Post a bounty on it!](https://www.bountysource.com/issues/27473215-hrt-data-visualization?utm_campaign=plugin&utm_content=tracker%2F88329&utm_medium=issues&utm_source=github)** We accept bounties via [Bountysource](https://www.bountysource.com/?utm_campaign=plugin&utm_content=tracker%2F88329&utm_medium=issues&utm_source=github).

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions