Update php requirement to >=8.1 and upgrade twig/twig to ^3.11.2 #434
test.yaml
on: pull_request
Matrix: code_quality
Matrix: integration_test
Annotations
9 errors
|
integration_test (8.3, general)
Process completed with exit code 18.
|
|
integration_test (8.4, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.4, general)
The operation was canceled.
|
|
integration_test (8.2, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.2, general)
The operation was canceled.
|
|
integration_test (8.4, brancher)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.4, brancher)
The operation was canceled.
|
|
integration_test (8.1, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.1, general)
The operation was canceled.
|