Add 'tree' command to Hypernode Deploy to get overview and list of tasks for a stage #424
test.yaml
on: pull_request
Matrix: code_quality
Matrix: integration_test
Annotations
16 errors
|
code_quality (8.1)
Process completed with exit code 1.
|
|
code_quality (8.3)
The operation was canceled.
|
|
code_quality (8.3)
The strategy configuration was canceled because "code_quality._8_1" failed
|
|
code_quality (8.2)
The operation was canceled.
|
|
code_quality (8.2)
The strategy configuration was canceled because "code_quality._8_1" failed
|
|
code_quality (8.4)
The operation was canceled.
|
|
code_quality (8.4)
The strategy configuration was canceled because "code_quality._8_1" failed
|
|
integration_test (8.3, general)
Process completed with exit code 17.
|
|
integration_test (8.2, general)
The operation was canceled.
|
|
integration_test (8.2, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.4, general)
The operation was canceled.
|
|
integration_test (8.4, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.4, brancher)
The operation was canceled.
|
|
integration_test (8.4, brancher)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|
|
integration_test (8.1, general)
The operation was canceled.
|
|
integration_test (8.1, general)
The strategy configuration was canceled because "integration_test._8_3_general" failed
|