build(deps-dev): Bump prisma from 5.22.0 to 7.3.0 #6588
ci.yml
on: pull_request
Matrix: build
production
0s
preview
0s
Annotations
3 errors
|
build (24)
Process completed with exit code 1.
|
|
build (22)
The strategy configuration was canceled because "build._24" failed
|
|
build (22)
The operation was canceled.
|